89
Outline Specification
INPUT 230V
230 Volts / 0 to 16 Amps
+ / - 10%
OUTPUT 230V
RCD protected, 2 x MCB outputs of 10A & 1 x MCB
output of 16A
Separate switched channels for heating system
and charger
Turn pump on by
pressing the pump
button at the control
panel
INPUT 12V
2 x 20A battery inputs via 2 x 4 way connectors
SOLAR INPUT
1 X Dedicated solar panel input capable of
supporting 10A of solar power input (typically 180
to 200W) via a 2 way connector
Check the solar panel
rating plate to ensure
the maximum current is
<= 10A
OUTPUT 12V
25A total output via multiple switched channels
protected by 13 fused outputs
Integrated
CHARGER
Input 220-240 Volts AC +/- 10%, Frequency 50 Hz
+/- 6%, Current 3A max.
DC Output 13.6 to 14.4 Volts nominal, Current 25
Amps max (300 Watts).
Signal INPUT
4 x Fresh water level, 4 x Waste water level, 1 x
Engine running, plus multiple vehicle connections,
sensor inputs for temperature & humidity
Fresh water negative
sensed Waste water
negative sensed
Data IN / OUT
CANBUS Data communication and power to
Control Panel via 6 way connector CI-Bus Data
communication to CI-Bus enabled devices via
RJ11/12 connector
IP rating
IP31
Operating
temperature
Ambient 0 to 35° Celsius Charger case temperature
with full load 65° C Max
Automatic shutdown
and restart if
overheated /
overloaded
Dimensions
EC601, EC602,
EC652 &
EC653 PSU
Overall size (HxWxD) 180 x 305 x 135mm
Clearances 75mm above, 50mm left & right
Weight 3.8 Kg
EC800 Control
Panel
Overall size (HxWxD) 125 x 279 x 25mm Cut-out
size (HxW) 108 x 173mm + switch area
Fixing centres 250mm
X 74mm Weight 380g
EC635 Comms
Module
Overall size (HxWxD) 55 x 116 x 85mm
Weight 550g
EC840 Sensor
Overall size (HxWxD) 20 x 35 x 38mm
Weight 10g
5 Technical Data & Approvals
5.1 Equipment – EC652, EC653, EC800,
EC635 & PX300
SWIF T COMMAND
POWER CONTROL SYSTEM
ELEC
TR
IC
AL S
YS
TEMS
Summary of Contents for Select 122 2020
Page 2: ......
Page 3: ......
Page 4: ......
Page 5: ......
Page 6: ......
Page 7: ......
Page 11: ...10...
Page 31: ...30...
Page 32: ...31 EN RO U T E EN ROUTE Fix Go tyre repair kit 32 Cruise Control 34 Parking Sensors 34...
Page 41: ...40...
Page 42: ...41 A RRI VAL AT SI T E ARRIVAL AT SITE Positioning the motorhome 42...
Page 65: ...64...
Page 130: ...129 M O T O RH O ME C ARE Select 164 rear bed BED MAKE UP...
Page 131: ...130...
Page 139: ...138 JACKING POINTS Jacking Point Van Conversion T EC H NIC AL INF O RM AT IO N...
Page 145: ...144 T EC H NIC AL INF O RM AT IO N...