Rev. 2.4
- 61 -
© 2014 Suzo-Happ Group
Bill-to-
Bill™ 300XE
7.
Maintenance Chart
The following table is a guideline for the average periods when each level of maintenance should be
performed based on the average number of bills inserted into the unit per day (24h). Due to the wide
range of operating conditions the Bill-to-Bill can function under, this chart has been further divided into
three subgroups designated as A, B and C. Each group has a different timeline for levels 1, 2 and 3 which
are determined based on various factors. These factors include, but are not limited to, quality of bills, the
time period each bill is in circulation, climate and level of pollution in the immediate surroundings of the
unit. Since this classification is determined based on each individual project rather than country or region,
please contact your closest service center to verify which of the aforementioned groups would be best
suited for your project. This would help determine whether any modifications the average timelines below
are needed.
Bill per Day (BPD)
Level 1
Level 2
Level 3
≤ 250
3 Months
9 Months
2 Years and
9 months
≤ 325
3 Months
9 Months
2 Years and
3 months
≤ 500
2 Months
6 Months
1 Year and
6 months
≤ 750
1 Month
4 Months
1 Year
Period
(Whichever is First)
30,000 or
3 months
90,000 or
9 months
270,000 or
3 Years
Location
On-site
On-site
Workshop
Responsibility
Operator*
Field Technician*
Service Center
Technician*
Service time (Per Unit)
7-10min
30min-1h
2h-3h
* Trained and certified personnel only. Contact nearby Service Center or Suzo-Happ Group
Tech support to schedule your training
To obtain each individual schedule for levels A, B and C, please refer to supplementary document;
Serviceability_Schedule_Group_X_v.Y.Y.pdf
Where the level is identified by X, and revision is Y.Y.