Rev. 2.4
- 60 -
© 2014 Suzo-Happ Group
Bill-to-
Bill™ 300XE
6.6.
Cashbox (FLSCXXXXX)
Same steps as in Level 2 maintenance should be performed as well ensuring the cam is properly
functioning.
6.7.
Box Control Unit
Same steps as in Level 2 maintenance should be performed.
6.8.
B2B Power Interface (BBP-571X)
The power interface is an essential life-line for the Bill-to-
Bill™ 300XE unit. Ensure that the connector
is not loose and has no play about its location. Also, ensure the pins inside each of the 10 slots on the
connector are straight. If any damage is detected, the power interface must be replaced.
6.9.
Final Money Test
After the unit has been completely reassembled and all individual modules been tested the final test
stage may begin. This stage includes the money test which will verify al modules are working
correctly together. For the outline of the money test procedures please contact a Suzo-Happ Group
™ technical support department (See section 9)