Chapter 2: Server Installation
2-5
Installing the Outer Rails
Begin by measuring the distance from the front rail to the rear rail of the rack. Attach
a short bracket to the front side of the right outer rail and a long bracket to the rear
side of the right outer rail. Adjust both the short and long brackets to the proper
distance so that the rail can
fi
t snugly into the rack. Secure the short bracket to the
front side of the outer rail with two screws and the long bracket to the rear side of
the outer rail with three screws. Repeat these steps for the left outer rail.
Locking Tabs:
Both chassis rails have a locking tab, which serves two functions.
The
fi
rst is to lock the server into place when installed and pushed fully into the
rack, which is its normal position. Secondly, these tabs also lock the server in place
when fully extended from the rack. This prevents the server from coming completely
out of the rack when you pull it out for servicing.
Figure 2-2. Installing the Rack Rails
Warning:
do not pick up the server with the front handles. They are de-
signed to pull the system from a rack only.
Stability hazard. The rack stabilizing mechanism must be in place, or the
rack must be bolted to the
fl
oor before you slide the unit out for servicing.
Failure to stabilize the rack can cause the rack to tip over.
Summary of Contents for SUPERSERVER 6016T-NTF
Page 5: ...v Preface Notes...
Page 48: ...4 20 SUPERSERVER 6016T URF 6016T UF 6016T NTRF 6016T NTF User s Manual Notes...
Page 76: ...5 28 SUPERSERVER 6016T URF 6016T UF 6016T NTRF 6016T NTF User s Manual Notes...
Page 87: ...Chapter 6 Advanced Chassis Setup 6 11 Figure 6 6 Removing Replacing the Power Supply...
Page 88: ...6 12 SUPERSERVER 6016T URF 6016T UF 6016T NTRF 6016T NTF User s Manual Notes...
Page 114: ...A 2 SUPERSERVER 6016T URF 6016T UF 6016T NTRF 6016T NTF User s Manual Notes...