No. 7, Road 12, Industrial Zone, Taichung City 407, Taiwan
Tel: 886-4-2359-1190 Fax: 886-4-2359-3409
[email protected] www.sunriseiw.com.tw
6
INSTALLATION
The machine only requires the normal industrial concrete foundation. If the ground
is uneven and the machine vibrates during operation, use foundation bolts to tighten
the machine firmly to the ground or alternatively mount the machine on anti-
vibration pads.
IMPORTANT:
z
Maintain a spacious working area around the machine for safety.
z
Have the work area well illuminated with proper lighting.
z
Clean the scraps and waste materials regularly, and make sure the work area is
free of obstructing objects.
z
Keep the ground free of oil and make sure it is not slippery.
z
If long lengths of material are to be fed into the machine, make sure that they
will not extend into any gangways.
Crowded, poorly illuminated or slippery areas are often causes for accidents.
Remove all anti-corrosion grease after installing the machine. Check that the oil
reservoir, located in the machine base, has been properly filled. When refilling oil,
use recommended oil and fill the reservoir to the upper level of the oil level gauge.
Connecting Power Supply
Electrical wiring must be done by a qualified electrician. Before connecting the
electrical supply, make sure the voltage and current is compatible to the electrical
components in the machine. Check the data shown in the electrical control box.
IMPORTANT: Turn off Supply Electricity at your facility's circuit breaker
before making electrical connections to the machine.