![Stryker Operating Room Information System Preinstallation Manual Download Page 47](http://html.mh-extra.com/html/stryker/operating-room-information-system/operating-room-information-system_preinstallation-manual_1385978047.webp)
43
S
Task
Stryker
Communications
Hospital Staff
Telco
3. LEC brings PRI to
POD in building
• Project Engineer -
verify analog line
to hub functions by
performing a test call
to the Hub.
• Project Manager -
obtain PRI info and
provide to Project
Engineer.
• Verify POD is where
requested.
• Obtain Circuit ID
and switch specifics.
• Provide to Stryker
Project Manager.
Brings PRI to POD.
4. Information for
PRI line obtained
Project Engineer -
program CODEC.
5. PRI wiring is ex-
tended to the Hub
room
Project Manager or
Install Team - Verify
Hospital wiring to the
Hub Room is correct.
Extend the Demarca-
tion to the Hub Room
using proper wiring.
6. Connect the PRI
to the Hub
• Connect the Hub to
the PRI line in hub
room.
• Verify IMUX light
comes up green.
7. Turn Up PRI Line Be present for testing
on site.
Be present for testing to
provide access to Hub
room for LEC.
Test line at POD and
Hub room.
8. Test PRI Line
Make both outgoing
and incoming calls.
Watch Switch Activity
and make any neces-
sary changes.
9. Verify Line
Registered with
ISDN provider
Call 1(800) 222-7956 to
verify.
Register line if not
done.
10. Ensure all PRI
information and
analog line to hub
go into Stryker
Install database
Project Manger - pro-
vide information to
Technical Support
Manager.