10.1.2 Site Preparation Requirements
The following provide instructions that must be completed before installation.
10.1.2.1
Status System Controller
Each Status System Controller can support up to sixteen (16) cameras. If there is a Video Network
Hub, the Status System Controller will sit on top of it and will be powered through the Hub. This con-
troller will be operated by the touch panel.
Rough-in and cabling
One (1) 12" x 4" (300mm x 100mm) wall mounted cable chase from ceiling to 36" (1m) above the
finished floor for cabling to each Fixed OR Status Camera. Leave up to 15' (4.5m) of cable on both ends
of cable runs for Stryker Technician termination and cable management. If any of the cables exceed the
maximum length specified, please consult your Project Manager for necessary amplification/transmis-
sion equipment.
Power
This controller will plug into an outlet on the video network hub. If a hub is not present, one (1) stan-
dard electrical outlet is required.
10.1.2.2
Status Camera Power Supply
Each Camera Power Supply can support up to eight (8) cameras. The number of Camera Power Sup-
plies depends upon the number of Fixed OR Status Cameras. Please consult the Project Manager if it is
unclear as to the number of Camera Power Supplies the site must be prepared for.
Rough-in and cabling
Hospital/Contractor must install this power supply (usually in the ceiling above the Video Network
Hub) and will wire the cameras into the power supply. If a hub is not present, the placement of the
power supply box is at the Hospital's discretion.
Power
Hospital/Contractor must hard-wire this power supply to the 120V/60Hz Hospital power.
10.1.2.3 Wall/Ceiling Mounted Fixed Room Status Camera (WRC, CRC)
LA
Conduit
One (1) ¾" conduit terminated at nearest corridor cable tray
Back Box
• 4"W x 4"H junction box with single-gang mud ring
• Flush mounted at 12" below finished ceiling (wall mounted only)
Power
None
Cabling
• One (1) power cable and one (1) video cable
• One (1) Belden 8723 / 88723 (maximum 1000')
• One (1) Belden 8241 / 88241 (maximum 1000')
• Cables require 15' service loop at both ends
Note
All Status System cabling must be provided and pulled by the Hospital/Contrac-
tor prior to Stryker Installation.