![Stryker Operating Room Information System Preinstallation Manual Download Page 17](http://html.mh-extra.com/html/stryker/operating-room-information-system/operating-room-information-system_preinstallation-manual_1385978017.webp)
13
S
THREE-BAY DOCUMENTATION STATION (DOC3)
US
Dimensions
72"W x 90"H x 37"D
Power
Recommend seven (7) - 20 amp circuits
• One (1) circuit for quad outlet in lower section behind video router.
• One (1) circuit for quad outlet in lower section behind light PSB (if re-
quired).
• One (1) circuit for duplex outlet in lower section under touch panel.
• One (1) circuit for quad outlet in middle section behind digital capture
device.
• One (1) circuit for quad outlet in upper left section (if required).
• One (1) circuit for quad outlet in upper middle section (if required).
• One (1) circuit for quad outlet in upper right section (if required).
• All documentation station circuits require critical power.
Data
Per listed equipment
Backbox
Per listed equipment