S-CB Px 120 Manual
80
Now for every single boiler of the cascade the following two parameters must be selected and programmed ac-
cording to the above drawing.
Master:
C5 P5 DF
1
C2 P5 DA
0
Slave 1:
C5 P5 DF
0
C2 P5 DA
1
Slave 2:
C5 P5 DF
0
C2 P5 DA
2
And so on.
Menu C: Cascade
C 5 C a s S i / M a
0
Function for the cascading of the boiler(s).
This parameter sets the function of the boiler at a
cascade alignment
0 = Single / Slave unit
1 = Master unit
Menu C: Cascade
C 2 B u s a d d r e s s
0
Function for the cascading of the boiler(s).
This parameter determines the address of the boiler
for the total cascading control.
Master = 0, Slave1 = 1, etc.
When the correct parameter is set, this must be confirmed at the confirmation screen. After activation, the value
will blink for a few seconds while the parameter is programmed into the boiler.
15
16
Summary of Contents for S-CB Px 120
Page 2: ...S CB Px 120 Manual 2 ...
Page 6: ...S CB Px 120 Manual 6 ...
Page 33: ...S CB Px 120 Manual 33 9 4 Electrical schematics ...
Page 34: ...S CB Px 120 Manual 34 ...
Page 111: ...S CB Px 120 Manual 111 ...
Page 115: ...S CB Px 120 Manual 115 weather dependent control 49 73 ...
Page 116: ......
Page 117: ......