5.2.
Mounting the boiler
Before mounting and installing the boiler the following connections should be considered:
•
Flue gas system and the flue gas pipe connections
•
Air supply system and connections
•
Flow and return pipe connection and pump position
•
Condensate and pressure relief valve drainage
•
Power supply (preferably the power connection positioned above the boiler)
All lines/piping must be mounted free of tension. The weight of all the installation components
should be supported separately from the boiler so there will be no standing force on the connec-
tions.
→
Pay attention to this while choosing the mounting position of the boiler.
Determine the position of the flow and return pipes by using the included suspension bracket or a suspension
frame (when supplied).
While marking the holes, ensure that the suspension bracket or frame is perpendicular and the boiler does not
lean forward. If necessary adjust the position with the adjusting bolts at the lower rear side of the back panel (see
drawing).
When the adjusting bolts aren’t sufficient, fill the gap behind the bolts to get the boiler in position. The exact boiler
position lies between the boiler hanging level and hanging slightly backwards. The boiler should not lean forward
in the mounted position.
Boiler suspension
Detail boiler suspension
3
. Lock boiler with locking plate
and two bolts
2
. Suspend boiler with suspension
bracket on mounting bracket
4
. Level boiler using
adjusting bolts
1
. Attach mounting bracket to wall
with inclined side facing upwards
Summary of Contents for S-CB Px 120
Page 2: ...S CB Px 120 Manual 2 ...
Page 6: ...S CB Px 120 Manual 6 ...
Page 33: ...S CB Px 120 Manual 33 9 4 Electrical schematics ...
Page 34: ...S CB Px 120 Manual 34 ...
Page 111: ...S CB Px 120 Manual 111 ...
Page 115: ...S CB Px 120 Manual 115 weather dependent control 49 73 ...
Page 116: ......
Page 117: ......