17.
MAINTENANCE
17.1.
General
For a good, safe and long-time operation of the boiler it is advised to carry out maintenance and service on the
boiler.
Maintenance and inspection of the boiler should be carried out at the following occasions:
•
When a number of similar error codes and/or lock-outs occur.
•
At least every twelve months, maintenance must be done to ensure safe and efficient operation.
Damage caused by lack of maintenance will not be covered under warranty.
MAINTENANCE REMINDER FUNCTION.
←
See previous page.
BE AWARE : This function is standard turned off. We offer this programmable function to the installer to use as a
reminder. Because it concerns a free programmable function the use of it cannot be used as an argument in war-
ranty cases. Our units must be maintained every twelve months whatever the settings/working of this function.
It is and remains the responsibly of the end user to have the unit maintained every twelve months.
For more information about this maintenance mode see § 10.14. ‘Setting the maintenance specifications’, page
55.
Service intervals
The normal service frequency for the boiler is once a year. Every year the boiler should be cleaned and checked,
according to the maintenance procedures. If there is doubt whether the boiler is operating with the correct water
and/or combustion air quality, it is advised that a first check is already executed after six months. This check
serves to determine the frequency of the future services. The maximum interval between two services is a year.
INSPECTION AND MAINTENANCE MUST BE EXECUTED FOR A SAFE AND EFFICIENT OPERA-
TION OF THE BOILER.
17.2.
Annual inspection & maintenance
Inspection, maintenance and the replacement of boiler parts should only be done by a skilled service engineer.
Apart from the maintenance proceedings it is advised to have a log chart for every boiler that describes the follow-
ing aspects:
•
Serial number
•
Date and time of maintenance
•
Name of maintenance engineer
•
Which parts were exchanged during maintenance
•
Which settings (software) were changed during maintenance
•
Special remarks / findings
•
Future aspects that need extra attention
•
Additional aspects: measurement reports, complaints by the (end)-user, lock-out codes, etc.
During maintenance the following parts and aspects of the boiler should be checked and inspected.
NOTICE: Before starting to work on the boiler:
•
Switch off the electrical power to the boiler (service switch and/or unplug boiler)
•
Close the gas valve to block gas supply to the boiler
Customer comments
Comments and remarks from the customer should be analysed and used to find possible causes for any occurring
problems and complaints.
Summary of Contents for S-CB Px 120
Page 2: ...S CB Px 120 Manual 2 ...
Page 6: ...S CB Px 120 Manual 6 ...
Page 33: ...S CB Px 120 Manual 33 9 4 Electrical schematics ...
Page 34: ...S CB Px 120 Manual 34 ...
Page 111: ...S CB Px 120 Manual 111 ...
Page 115: ...S CB Px 120 Manual 115 weather dependent control 49 73 ...
Page 116: ......
Page 117: ......