S-CB Px 120 Manual
48
HOT WATER PROGRAM
> > > From previous page with HEATING part < < <
Setting DHW program times:
P r o g r a m D H W
M o n 1 0 6 : 0 0
- 2 3 : 0 0
Press [
►
] to browse through the values that can be set at the bottom
line. The blinking value can be changed.
Press [
▲
] & [
▼
] to change the selected (blinking) value.
Press [ENTER] for confirmation screen when all settings are done.
Confirmation screen:
A r e y o u s u r e
< C a n c e l ; > C o n f i r m
Press [
◄
] to cancel the changes made (unit will reset).
Press [
►
] to confirm the changes. The last alternation will be
blinking for a few seconds and return to base menu.
Press [MENU] to exit. The boiler will reset and go to the operating
screen.
Press [
◄
] for next SCREEN
Copy programmed day for DHW:
C o p y f r o m :
D H W M o n
C o p y t o : D H W
T u e
Press [
►
] to switch between "Copy from" and "Copy to". The blinking
day is selected and can be changed.
Press [
▲
] & [
▼
] to change the selected (blinking) value.
Press [ENTER] for confirmation screen when all settings are done.
Confirmation screen:
A r e y o u s u r e
< C a n c e l ; > C o n f i r m
Press [
◄
] to cancel the changes made (unit will reset).
Press [
►
] to confirm the changes. The two days will blink for a
moment.
Press [MENU] to exit. The boiler will reset and go to the operating
screen.
Press [
◄
] for next SCREEN
> > > Continue on next page LEGIONELLA program < < <
Summary of Contents for S-CB Px 120
Page 2: ...S CB Px 120 Manual 2 ...
Page 6: ...S CB Px 120 Manual 6 ...
Page 33: ...S CB Px 120 Manual 33 9 4 Electrical schematics ...
Page 34: ...S CB Px 120 Manual 34 ...
Page 111: ...S CB Px 120 Manual 111 ...
Page 115: ...S CB Px 120 Manual 115 weather dependent control 49 73 ...
Page 116: ......
Page 117: ......