System C heck-O ut
Chapter 2 - Description and Installation
System Check-Out
After completing installation on the
DHS-L
system, it must be initialized so that default
data can be loaded. Prior to actual power up and initialization, the
DHS-L
should be
checked-over to avoid startup delays or improper loading:
1. Make sure that the KSU is properly grounded.
2. Verify that all PCBs are firmly seated onto their connectors.
3. Inspect the MDF for shorted wiring and improper polarity that would affect the
Digital Key Terminals or DSS consoles.
4. Make sure that the plug-ended MDF cables connected to the KSU are secure and are
plugged into the correct position.
Power Up Sequence
The power up sequence involves the proper application of AC power to the system. A
successful power up is assured if the installation procedure has been followed:
1. Plug the AC power cord of the KSU into the dedicated 117V AC outlet.
2. Locate the database INITIALIZATION jumper JP3 on the MPB (refer to
Figure 2-28
). It is
located at the front edge of the MPB (in the center). It is also labeled ON and OFF.
Figure 2-28: Jumper Switch
3. This jumper controls the connection to the dynamic RAM battery circuit. When
jumper is OFF, customer database programming is not protected by the memory
battery in the event power is lost. In normal operation this jumper should be ON at all
times.
4. To load default at this time, turn KSU power OFF.
5. Operate the INITIALIZATION jumper to the OFF (left) position.
6. Allow the system and jumper to remain in this state for approximately 2 minutes.
7. Operate the INITIALIZATION jumper to the ON (right) position.
8. Restore system power.
MPB Jumper Switch (JP3)
Summary of Contents for Starplus DHS-L
Page 1: ...Technical Manual The Answer To Your Company s Growing Communication Needs DHS LTM ...
Page 2: ......
Page 3: ...S T A R P L U S D H S L Key Telephone System Technical Manual Issue 2 October 2001 ...
Page 14: ... N O T E S ...
Page 16: ......
Page 20: ......
Page 70: ...2 52 Feature Upgrade Procedure Chapter 2 Description and Installation ...
Page 72: ......
Page 220: ...3 150 Voice Mail Chapter 3 Key Station Features Operation and Programming ...
Page 222: ......
Page 240: ...4 20 Voice Mail Chapter 4 SLT Features and Operation ...
Page 242: ......
Page 254: ...5 14 Configurations Chapter 5 HOTEL MOTEL Operator Features ...
Page 256: ......
Page 266: ......
Page 284: ......
Page 286: ...B 4 Basic Optional Equipment Appendix B Part Numbers ...
Page 293: ......