
SplashMe Automation Controller 1.0 | Installation and Operating Instructions
© Nymet Innovations Pty Ltd 2019 | Revised November 2019
19
3.2 - Installing the multi-probe
The multi-probe comes installed in a protective cap which contains a storage solution. This
storage solution keeps the pH probe glass hydrated and ensures the probe will be ready to
use as soon as soon as it is installed.
Instructions
1.
Unscrew the black locking nut anti clockwise to remove the protective cap
2.
Discard the storage solution, rinse the cap in water and then dry the cap with a soft
paper towel. The cap can then be attached to the mounting bracket as shown
below ready for use at the next calibration
3.
Line up the groove on the multi-probe with the tongue on the housing, slide into
position and then hand tighten the black locking nut.
See Diagram
Warning
Do not over tighten locking nut as this may cause damage to the
sensitive multi-probe