Transportation/Setting-up
SPECTRO GENESIS FES 27 — 17.07.2019
— 19
4.4
Dust load
Avoiding contamination problems in the analysis requires a relatively dust-free
environment.
The maximum dust load should not exceed 36 million particles (0.5 µm or larger)
per cubic meter of air. Operating the instrument in an environment with a higher
dust load shortens maintenance intervals and may damage the instrument.
Example for comparison: A usual, clean office environment contains 18 to 36
million particles per cubic meter of indoor air.
To avoid instrument damage, the instrument must also be set up in an
environment which is free from corrosive vapors.
4.5
Transport
Notice – Damage to instrument!
If the instrument is to be moved to another place of installation after set-up, there
is a risk of damaging the instrument. Contact the SPECTRO Service Department
in this matter.
The instrument must be raised prior to transport by forklift. A special transport
device has been provided for this purpose.
Each side of the transport device consists of two support poles, a crossbar and
two spring cotters.
To assemble the transport device, proceed as follows:
1.
Rotate the eyelet of each
support pole to a horizontal
position.
2.
Insert the support poles in the
proper openings in the housing.
3.
Rotate the support pole a
quarter turn until you feel it
latch.
Fig. 7
Summary of Contents for FES 27
Page 2: ......