4. Confirm the inlet valve and the brine discharge valves are in the
RUN position
The Brine Discharge valve handle should point up
The Feed water valve handle should point down
5. Open the oilers on the SP20 crankcase and allow 5—6 drops of
oil to lubricate the pump plungers.
6. Turn on the power to the system and the Spectra Connect screen will display, “Has
the system been stored with chemicals?” Press ‘Yes’, to start the Purge sequence.
The system will purge the storage chemicals with feed water.
Note: The watermaker will shut down if the pressure relief valve is closed during
the Purge mode.
7. The system will start purging and the display
will show the progress and time remaining
for the purge cycle.
New System Start-Up and Testing continued...
Summary of Contents for LB-20000
Page 2: ...2 Page Intentionally blank...
Page 4: ...4 Page Intentionally blank...
Page 48: ...48 Black Parker tube fittings...
Page 49: ...49 John Guest Super Speedfit Fittings...
Page 64: ...64...
Page 65: ...65...