Installing the Front Glass Panel and Frame
After burner media and relief doors been installed, the next step is to replace the front glass panel and
frame.
1. Carefully pick up the glass and glass frame assembly by grasping the
sides of the frame and using your thumbs and fingers to hold the glass
in place within the gasket and frame.
2. With the glass frame (and glass) held at a slight angle (leaving room
for your fingers between the frame and the firebox) insert the bottom
edge of the frame into the frame retainer located on the bottom front of
the firebox. Take care to center the frame from left to right.
3. Once the bottom edge is in place, move your fingers out of the way
and press the top of the frame against the firebox while pushing down
to be sure the frame is fully engaged in the frame retainer.
4. Hold the frame in place with one hand and insert the seven glass frame
fasteners along the top edge of the glass frame. Tighten the fasteners
until they are hand-tight.
5. Tighten each fastener 1/2 turn at a time, working from one side to the
other, until the glass frame has made contact with the firebox face
along the entire top edge. Do not over-tighten the fasteners as this can
put excessive stress on the glass.
6.
Draft relief openings must not be covered or blocked.
ASSEMBLY & INSTALLATION
RELIEF DOOR FRONT TAB
ENGAGED ON RETAINERS
RELIEF DOOR SHOWN IN PROP-
ER OPERATING POSITION