◇
24
4.2.1
Test Interface
The test interface is used to start the test process to test the DUT according to the existing
requirements.
Use the "TEST" button to enter
The interface is as follows: (taking AC as an example)
Figure 4.2.1 AC Test Interface
Note:
1.
High-voltage measurement of the DUT can be started in the TEST interface. Parameters
modification can not be done in this interface.
2.
the instrument high voltage start must meet: The "INT LOCK" instrument online lock signal of the
HANDLER interface is closed. (ST9010-IL plugged into the HANDLER interface), the "STOP" button is not
pressed , any "START" button is pressed.
3.
Press (direction key) on this interface can quickly switch to the (SETUP) interface.
4.
F6 function key can lock the key board, the instrument responds only to the INT LOCK, START,
STOP, and F6 (unlock) keys after the keyboard is locked, note that the unlock operation is
controlled by the password setting of the system environment interface.
After the measurement is started, the instrument displays the real-time test data displayed in the test.
At FAIL, the instrument determines the working method according to the failure mode function. See
the interface parameter description for details.
When all test steps are completed, PASS, the instrument will display the total PASS test result, after
waiting for a certain period of time, it will automatically return to the test waiting state.
When all test steps are completed with FAIL, the instrument will display the FAIL test results.
Press the STOP button to return to the test wait state.
4.2.2
Setup Interface
The SETUP interface is used to set test items according to the safety requirements of the product, and
arrange the test sequence.
Press the "SETUP" button to enter