PAT-806-IT
– USER MANUAL
52
Additional information displayed by the meter
Lack of continuity in conductor L.
Lack of continuity in conductor N.
L and N are shorted.
L and N are replaced.
4.15 Automatic tests
Keep pressing
AUTO/IEC
, until the screen
with the test choice is displayed (1 ... 20), the
number of test blinks.
Notes:
- Only numbers of programmed tests are displayed
- If no test is programmed, after pressing
AUTO
the meter immediately enters the set-up mode
(
is displayed).
- Programmed test is a test where at least for one class, one measurement is performed (set on
).
- Default programmed tests are: 1 ... 4 for all three classes.
Summary of Contents for PAT-806-IT
Page 1: ......
Page 2: ......
Page 74: ...PAT 806 IT USER MANUAL 72 NOTES...
Page 75: ......
Page 76: ......