5
After removing the packaging, verify the contents to check its integrity and
completeness. If the package contents does not correspond to the parts list specified
on item 1, please contact the entity from whom you purchased the unit.
All the unit's components guarantee its operation and energy efficiency and should only
be replaced with original parts provided by an authorised technical assistance centre
The unit must be serviced at least once a year by the installation engineer.
This manual is provided with the product. Please keep it beside the unit.
“All national and local regulations and European Standards shall be complied with when
operating the appliance”.
For your safety, we recommend that:
You fully read and understand the information detailed in this manual before
handling the pellet-run boiler, which is a biomass heating unit.
You make sure the hydraulic circuit was correctly assembled and connected to the
water supply before turning on the pellet-run boiler.
The boiler is not intended for use by children or persons with limited physical,
sensory or mental capabilities, nor by those lacking experience and knowledge, unless
under direct supervision or instruction.
Do not touch the boiler when barefoot, nor when any part of your body is wet or
humid.
Do not tamper with safety or adjustment features without the manufacturer's
authorization;
Do not cover or reduce the size of the vents at the installation area;
The pellet-run boiler requires good air supply to guarantee correct combustion; as
such, if the unit is kept in an air tight environment or is exposed to other existing
sources of air extraction, its correct functioning may be impeded.
The existence of vents is a requisite for proper combustion;
Do not leave the packing materials near children;
When the unit is operating normally, the boiler door cannot be opened.
Avoid direct contact with parts of the unit that tend to become hot during
operation;
Check the existence of any obstructions on the fume duct before turning on the unit
after a long period of inactivity;
This pellet-run boiler is intended for residential use, within a protected
environment. Safety systems may intervene to shut down the boiler. If this occurs,
contact technical assistance. In any circumstances should you attempt to interfere with
the safety systems;
Summary of Contents for Douro 12kW
Page 13: ...12 a b ...
Page 50: ...49 ...
Page 51: ...50 ...
Page 52: ...51 ...
Page 58: ...57 18 Electrical Diagram of the Free Standing Fire Unit Figure 40 Electrical diagram ...
Page 70: ...69 21 Annexes 21 1 Flow chart Lighting ...
Page 71: ...70 ...
Page 72: ...71 Disabling ...