18
- Check if the pellet reservoir is supplied with pellets. Inside the pellet reservoir is a
safety grid to prevent users from reaching the worm screw.
The unit’s combustion chamber and panel door are made of iron plate
painted with high temperature resistant paint which releases fumes during
the initial burn due to the paint’s curing process. Avoid touching the unit
during its first burn to prevent leaving permanent marks on the paint. The
paint goes through a more plastic phase during the curing process. The curing
of the paint occurs at approximately 300ºC for 30 minutes.
Please make sure the room where the unit is installed has adequate air circulation;
otherwise, the unit will not work properly. For this reason, it is important to check if
there are any other air-consuming heating appliances present in the room (e.g. gas
units, braziers, extractors, etc.); these should not be used simultaneously with the
unit.
This Free Standing Pellet Fire unit has a probe for measuring the room temperature.
This probe is attached to the grid at the rear panel (Figure 9). For a good reading of
the room temperature, avoid the contact between the end of the probe and the unit
surfaces. You may also attach the probe to the wall beside the unit.
Figure 10 – Room temperature probe
Summary of Contents for Douro 12kW
Page 13: ...12 a b ...
Page 50: ...49 ...
Page 51: ...50 ...
Page 52: ...51 ...
Page 58: ...57 18 Electrical Diagram of the Free Standing Fire Unit Figure 40 Electrical diagram ...
Page 70: ...69 21 Annexes 21 1 Flow chart Lighting ...
Page 71: ...70 ...
Page 72: ...71 Disabling ...