37
Figure 17 – Opening the lid of the pellet reservoir
11.3. Filling the Pellet Reservoir
1 – Open the pellet reservoir lid on the top of the unit, as shown in Figure 17.
2 – Empty the pellet bag onto the reservoir, as shown in Figure 18.
Figure 18 – Refilling the pellet reservoir
3 – Turn on the unit and replace the lid.
12. Installation and operation using remote command
(chrono-thermostat) – not included with the boilers
The pellet-run boilers are mass produced with a command display. Alternatively, the
units can be operated using a generic remote command unit (chrono-thermostat).
Note: the remote command unit normally comes accompanied by a manual. An
interface must be installed in order to use the remote command (19–c).
Summary of Contents for Douro 12kW
Page 13: ...12 a b ...
Page 50: ...49 ...
Page 51: ...50 ...
Page 52: ...51 ...
Page 58: ...57 18 Electrical Diagram of the Free Standing Fire Unit Figure 40 Electrical diagram ...
Page 70: ...69 21 Annexes 21 1 Flow chart Lighting ...
Page 71: ...70 ...
Page 72: ...71 Disabling ...