Figure 25 and Figure 26 detail cable types and connections of one
battery (LG-chem Resu10H). Prepare cables and connect as described in the following
table:
StorEdge
Connection Unit
connection
LG Chem
RESU10H
battery
connection
Connection method
to the
StorEdge Connection
Unit
Recommended cable
type
(min-max AWG)
DC
BAT + terminal block
DC+
Insert a flat blade
screwdriver into the
square opening at
the top of the
terminal block and
press to open clamp
mechanism.
Insert the wire into
the round opening
and release the
screwdriver to
spring back and
clamp the wire.
DC cable 10 AWG (10-
14 AWG), 600V
insulated.
BAT - terminal block
DC-
Control and monitoring
5-pin communication
terminal block:
6-pin connector
Press the protrusion
at the top of the
terminal block to
open the connection
hole, insert the wire
and release to spring
back and clamp the
wire.
5-wire shielded
twisted pair cable 24
AWG (16-24AWG),
600V insulated.
CAT5 600V insulated
can also be used.
En (Enable)
ENABLE_H
V+
Not connected
B- (RS485)
(1)
RS485_L -
(2)
A+ (RS485)
1
R
2
G (RS485)
EN_G
(1)Must be twisted pair
(2)Must be twisted pair
Chapter 7: StorEdge Inverter Connections
61
StorEdge Solution with Backup MAN-01-00262-1.5