Step 6 - Connecting all components to the inverter
- connect the auto transformer and
loads (AC), PV strings (DC), and meter. Refer to
StorEdge Inverter Connections on page
56. .
Step 7 - Commissioning the inverter
- Activate the system and pair the power
Commissioning the Installation on page 45.
Step 8
-
Connecting to the monitoring platform
the Monitoring Platform on page 96.
Step 9
-
System Configuration
- Configuring the RS485 bus and StorEdge applications.
System Configuration on page 109.
The following flowchart appears throughout this Installation Guide to assist with the
installation steps:
For additional information, refer to
https://www.solaredge.com/sites/default/files/storedge_wiring_quick_guide_and_
.
StorEdge Solution with Backup MAN-01-00262-1.5
18
Installation Workflow