![SolarEdge StorEdge Solution with Backup Installation Manual Download Page 145](http://html1.mh-extra.com/html/solaredge/storedge-solution-with-backup/storedge-solution-with-backup_installation-manual_1313758145.webp)
Figure 50: External shutdown switch connection
3. Connect the external shutdown switch wires to the E1 and E2 terminals.
4. Close the StorEdge Connection Unit cover.
5. Turn on the external shutdown switch.
6. Turn on AC.
7. Enable remote shutdown:
a. Enter Setup mode.
b. Select
Maintenance
è
Power Control
è
Remote Shutdown
è
Enable
.
To check the external shutdown switch operation:
1. Turn on the inverter
Remove the StorEdge Connection Unit covers: on page 38
2. Turn off the inverter's AC circuit breaker on the main distribution panel.
3. Make sure the inverter switches to Backup mode.
4. Turn off the external shutdown switch.
5. Check that the DC voltage (displayed on the inverter's LCD) decreases to 30V within
30 seconds.
6. Turn on the external shutdown switch.
StorEdge Solution with Backup MAN-01-00262-1.5
144
Appendix D: External Rapid Shutdown