![SolarEdge SE3K-N4 Installation Manual Download Page 79](http://html1.mh-extra.com/html/solaredge/se3k-n4/se3k-n4_installation-manual_1313739079.webp)
7. Remove the screw securing the Primary Unit to the mounting bracket and remove the Primary Unit
from the mounting bracket.
NOTE
If you remove the Primary Unit and do not immediately install a new one, use insulation tape to
isolate any exposed wires.
8. Place the new Primary Unit on the mounting bracket; insert the screw securing the Primary Unit
through the right side of the heat sink and into the bracket.
9. Connect the DC, AC wires and the communication connectors to the Primary Unit.
10. For a 3 unit inverter reconnect the AC, DC and comm cables from the Connection Unit to the right
Secondary Unit.
11. Close the Primary Unit cover.
12. Perform the commissioning steps as described in
Activating, Commissioning and Configuring the System
Using SolarEdge Inverter SetApp
13. In the monitoring platform, use the
Replace
button in the
logical layout
tab (in site Admin).
Replacing a Secondary Unit
1. Turn OFF the Inverter ON/OFF switch, and wait until the green LED is blinking , indicating that the DC
voltage is safe (<50V), or wait five minutes before continuing to the next step.
WARNING!
If you cannot see Primary Unit LEDs or you cannot connect to the Primary Unit, or if the red LED light is
on indicating a malfunction , wait five minutes for the input capacitors of the inverter to discharge.
2. Disconnect all the connectors on the bottom of the Secondary Unit.
3. Remove the screw securing the Secondary Unit to the mounting bracket and remove the Secondary
Unit from the mounting bracket.
4. Place the new Secondary Unit on the mounting bracket.
5. Insert one of the supplied screws through the outer side of the heat sink and into the bracket.
6. Perform pairing as described in
Activating, Commissioning and Configuring the System Using SolarEdge
Replacing the Connection Unit
Removing the Connection Unit
1. Turn OFF the Inverter ON/OFF switch, and wait until the green LED is blinking , indicating that the DC
voltage is safe (<50V), or wait five minutes before continuing to the next step.
WARNING!
If you cannot see Primary Unit LEDs or you cannot connect to the Primary Unit, or if the red LED
light is on indicating a malfunction, wait five minutes for the input capacitors of the inverter to
discharge.
2. Disconnect the AC to the inverter by turning OFF the circuit breakers on the distribution panel.
Three Phase Inverter with synergy technology Guide MAN-01-00402-1.1
78
Replacing a Secondary Unit