![SolarEdge SE3K-N4 Installation Manual Download Page 39](http://html1.mh-extra.com/html/solaredge/se3k-n4/se3k-n4_installation-manual_1313739039.webp)
Setting Country and Language
1. From the Commissioning screen select
Country and Language
.
Country and Language
Cou n t r y
G e r m a ny
q
La n g u a g e
D e ut s ch (G e r m a ny )
q
2. From the
Country
drop-down list, select the required country setting.
WARNING!
The inverter must be configured to the proper setting in order to ensure that it complies with the
country grid code and functions properly with the country grids.
1. From the
Language
drop-down list, select the language.
2. Tap
OK
.
Pairing
Once all connections are made, all the power optimizers must be logically paired to their inverter. The
power optimizers do not start producing power until they are paired. This step describes how to assign
each inverter to the power optimizers from which it will produce power.
Perform this step when the modules are exposed to sunlight. If the string length is changed or a power
optimizer is replaced, repeat the pairing process.
1. From the main menu, select
Pairing
.
Pairing
T a p t h e b u t t on b e l ow t o s t a r t t he
p a i r i n g p r oce s s
S t a r t pa i r i ng
2. Tap
Start Pairing
.
Three Phase Inverter with synergy technology Guide MAN-01-00402-1.1
38
Setting Country and Language