2. If required, mark the mounting hole locations and drill the hole.
CAUTION!
Do not drill through the power optimizer or through the mounting holes. The drilling vibrations can
damage the power optimizer and will void the warranty.
3. Attach each power optimizer to the rack using M6 (1/4'') stainless steel bolts, nuts and washers or
other appropriate mounting hardware. Apply torque of 9.5 N*m / 7 lb*ft.
4. Verify that each power optimizer is securely attached to the module support structure.
5. Record power optimizer serial numbers and locations, as described in
Step 2: Connecting a PV Module to a Power
Optimizer
NOTE
Images are for illustration purposes only. Refer to the label on the product to identify the plus and
minus input and output connectors.
For each of the power optimizers:
l
Connect the Plus (+) output connector of the module to the Plus (+) input connector of the power
optimizer.
l
Connect the Minus (-) output connector of the module to the Minus (-) input connector of the
power optimizer.
Figure 4: Power optimizer connectors
Step 3: Connecting Power Optimizers in Strings
You can construct parallel strings of unequal length, that is, the number of power optimizers in each
string does not have to be the same. The minimum and maximum string lengths are specified in the
power optimizer datasheets. Refer to the SolarEdge Site Designer for string length verification.
NOTE
l
Use at least 11 AWG/ 4 mm² DC cables.
l
The total conductor length of the string (excluding power optimizers’ conductors; including home
runs and necessary extensions between optimizers) should not exceed:
o
2300 ft./ 700 m from DC+ to DC- of the inverter