![SolarEdge SE K Series Installation Manual Download Page 54](http://html1.mh-extra.com/html/solaredge/se-k-series/se-k-series_installation-manual_1313719054.webp)
Communication Board
The communication board is located, inside the Synergy Manager and serves as the
communication hub of the inverter.
Figure 28: Synergy Manager - communication board
The Communication Board includes the following interface connectors:
Cellular antenna - Antenna port for a Cellular Plug-in modem connecting the
inverter to the internet.
Wi-Fi Antenna - Wireless LAN antenna port for connecting the inverter to an
internet modem
Power Reduction Interface (PRI) - Connecting the Inverter to a power reduction
device, such as a generator.
For more information, refer to:
Power Control Configuration - Application Note
RS485-1 / RS485-2 connector - Two Modbus ports for connecting multiple
inverters, over the one line to the Internet. The ports are also used for connecting
peripheral devices such as meters, a batteries and a third party data logger.
LAN port - Ethernet cable port for connecting the inverter to an internet modem
Removing the Synergy Manager Cover
To accsses the communication board, remove the Synergy Manager cover.
Chapter 6: Setting Up Communication with the Monitoring Platform
53
Three Phase Inverters with Synergy Technology
Summary of Contents for SE K Series
Page 74: ......