Chapter 3: Installing the Synergy Manager and
Synergy Units
This section, describes how to install the inverter. Install the Synergy Manager and
Synergy Unit either before or after the PV modules and Power Optimisers have been
installed.
The inverter is provided with a mounting template that ensures correct installation
location of the Synergy Manager and all Synergy Unit mounting brackets. The template
ensures that all the Synergy Unit inter-connecting cables can reach the Synergy Units
and correct distance between the units ensures proper heat dissipation.
First, mount the Synergy Units and then the Synergy Manager. The Synergy Units can
be installed in any order.
Synergy Manager Package Contents
Synergy Manager
Synergy Units
Installation template
Mounting bracket kit
Two Allen screws for fastening the unit to the mounting bracket
Cable lock(s)
Quick Installation guide
Synergy Unit Package Contents
Synergy Unit
Mounting bracket kit
Two Allen screws for fastening the unit to the mounting bracket
Identifying the Units
Stickers on the Synergy Manager and Synergy Units show Serial Numbers
.
When creating a site in the SolarEdge Monitoring platform or contacting SolarEdge
support, provide the inverter's serial number.
Chapter 3: Installing the Synergy Manager and Synergy Units
21
Three Phase Inverters with Synergy Technology