When the inverter starts converting power after the initial connection to the AC, the
inverter enters Wake up mode until its working voltage is reached. This mode is
indicated by the flickering green inverter LED.
When working voltage is reached, the inverter enters Production mode and
produces power. The steadily lit green inverter LED indicates this mode.
4. Tap
OK
to return to the
Commissioning
menu.
Communication
Communication settings can be configured only after communication connections are
complete. Refer to
Setting Up Communication with the Monitoring Platform on page 50.
Select
Monitoring Communication
to configure communication with the
monitoring platform.
Select
Site Communication
to configure communication between multiple
SolarEdge devices or external non-SolarEdge devices, such as batteries or loggers.
Power Control
Power control options are detailed in the
Power Control Application Note, available on
https://www.solaredge.com/sites/default/files/application_
note_power_control_configuration.pdf
Step 3: Verifying Proper Activation and
Commissioning
1. Select
Information
and verify that the correct firmware versions are installed on each
inverter. To save the information to a read-only file, tap the
icon (iOS) or the
JPEG
icon (Android) at the bottom of the screen.
2. Select
Status
and verify that inverter is operating and producing power.
3. Verify that additional configurations were properly set by viewing the relevant
Status screens.
4. Verify that the green inverter LED is steadily lit.
Your SolarEdge power harvesting system is now operational.
Pre-commissioning (Off-Grid)
The following items are required for Pre-commissioning:
Mobile device with SolarEdge SetApp application
Power bank: 60W output port, USB-C Power Delivery (PD): 20V 3A (not provided)
Three Phase Inverters with Synergy Technology
46
Step 3: Verifying Proper Activation and Commissioning
Summary of Contents for SE K Series
Page 74: ......