The following table describes production percentage of AC information by LED color
and ON/OFF/P switch position.
Indication
ON/ OFF/
P
switch
position
LED color
Comment
Red
Green
Blue
Percentage of AC
Production:
0 - 33 %
ON (1)
OFF
ON
OFF
This indicates
power production
as percentage of
rated peak AC
output power
Percentage of AC
Production:
33 - 66 %
OFF
OFF
ON
Percentage of AC
Production:
66 - 100 %
OFF
ON
ON
Inverter Interconnection Cable Interfaces
The cables on the right hand side of the Synergy Manager, interfaces the Synergy
Manager to the Synergy Unit of the inverter.
NOTE
Models of the Three Phase Inverters with Synergy Technology are provided
with either two or three Synergy Units. The following connection description
refers to inverter models with three Synergy Units. In inverter models with two
Synergy Units, the Manager Unit connects to the left and center Synergy Units.
To connect cables, follow the writing shown next to each cable on the panel.
Figure 9 shows the interconnecting cables of the inverter.
Figure 9: Inverter - interconnection cables
Three Phase Inverters with Synergy Technology
26
Inverter Interconnection Cable Interfaces
Summary of Contents for SE K Series
Page 74: ......