Synergy Manager External Cable Interface
The conduit entries, at the bottom side of the Synergy Manager, interfaces the inverter
to the grid and PV arrays. The communication glands, support communication cables
connecting the inverter to the SolarEdge Monitoring platform and external power bank
used for setting up the inverter in sites with no available grid power.
Figure 10: Synergy Manager - bottom view
AC Cable Entry
: AC cable gland for grid connection
AC Conduits Entry
: drill guides for conduits running AC cable from the grid
DC Conduits Entries
: drill guides for conduits running DC cables from the PV arrays
Power Bank Input
: power bank connection enables inverter pre-commissioning
when AC power is not connected
Communication Glands:
two communication glands for connecting
communication and antenna cables. Refer to
Setting Up Communication with the
Monitoring Platform on page 50.
Synergy Unit Interface Connectors
The Synergy Unit connectors are used to interface the Synergy Unit to the Synergy
Manager:
NOTE
Connect cables according to labels shown on the Synergy Manager.
DC connector
for DC input from the Synergy Manager
Communication connector
: for communication with the Synergy Manager
Chapter 3: Installing the Synergy Manager and Synergy Units
27
Three Phase Inverters with Synergy Technology
Summary of Contents for SE K Series
Page 74: ......