![SolarEdge SE K Series Installation Manual Download Page 12](http://html1.mh-extra.com/html/solaredge/se-k-series/se-k-series_installation-manual_1313719012.webp)
Figure 2: Synergy Manager with three Synergy Units
Monitoring Platform
The monitoring platform enables monitoring the technical and financial performance of
one or more SolarEdge sites. It provides past and online information on the system
performance, both at the system and PV module levels.
Designer
Designer recommends inverter and Power Optimiser selection per site size and enables
report generation. You can create a project in Designer and export the site design with
the PV array layout to the monitoring platform.
Installation Tools and Material List
Standard tools can be used during the installation of the SolarEdge system.
The following recommend tools is required for installation:
Standard flat-head screwdrivers set
Non-contact Voltage detector
Ring terminals crimping tool
Wire cutters
Wire strippers
Voltmeter
Chapter 1: Introducing the SolarEdge Power Harvesting System
11
Three Phase Inverters with Synergy Technology
Summary of Contents for SE K Series
Page 74: ......