![SolarEdge SE K Series Installation Manual Download Page 49](http://html1.mh-extra.com/html/solaredge/se-k-series/se-k-series_installation-manual_1313719049.webp)
6. When instructed, hold the ON/OFF/P Switch in P position and release within two
seconds and continue to follow the on-screen instructions.
7. Disconnect the power bank and cover the power bank input port.
8. Turn-off the DC Disconnect Switch and the ON/OFF/P Switch.
9. Wait until the inverter turns-off (all LEDs turn-off).
Reporting and Monitoring Installation Data
Monitoring the site requires connecting the inverter to the monitoring platform, using
any of the wired or wireless options available from SolarEdge. Refer to
Communication with the Monitoring Platform on page 50.
The Monitoring Platform
The monitoring platform provides enhanced PV performance monitoring and inverter
yield assurance through immediate fault detection and alerts at the module, PV array
and system level.
Using the platform, you can:
View the latest performance of specific components.
Find under-performing components, such as modules, by comparing their
performance to that of other components of the same type.
Pinpoint the location of alerted components using the physical layout.
The monitoring platform enables accessing site information, including up-to-date
information viewed in a physical or logical view:
Logical Layout: Shows a schematic tree-layout of the components in the system,
such as: inverters, Power Optimisers, PV arrays, modules, meters and sensors, as
well as their electrical connectivity. This view enables you to see which modules are
connected in each PV array, which PV arrays are connected to each inverter, and so
on.
Physical Layout: Provides a bird's eye view of the actual placement of modules in
the site, and allows pinpoint issues to the exact location of each module on a
virtual site map.
If you do not report the mapping of the installed Power Optimisers, the monitoring
platform will show the logical layout, indicating which Power Optimisers are connected
to which inverter, but will not show PV strings or the physical location of Power
Optimisers.
Three Phase Inverters with Synergy Technology
48
Reporting and Monitoring Installation Data
Summary of Contents for SE K Series
Page 74: ......