![SolarEdge SE K Series Installation Manual Download Page 17](http://html1.mh-extra.com/html/solaredge/se-k-series/se-k-series_installation-manual_1313719017.webp)
P860, P960 and M1600 Power Optimisers
Figure 3: Power Optimisers clearance
When installing PV modules in a confined space such as Building-integrated
photovoltaic (BIPV) modules, ventilation measures may be required to ensure that
the Power Optimisers are not exceeding the maximum temperatures stated in their
specifications.
Three Phase Inverters with Synergy Technology
16
Installation Guidelines
Summary of Contents for SE K Series
Page 74: ......