16. POINT PROJECTION
$
• It is also possible to perform setting-out line measurement when
[P-PROJ]
on
the Meas mode screen.
C
Allocating the function key: ."24.2 Allocating Key Functions"
Before performing point projection, the baseline must be defined.
X
PROCEDURE
1. Define the baseline.
C
"16.1 Defining Baseline"
2. Select "Point Projection" in <Point
Projection>.
3. Press
[EDIT]
, enter the point
coordinate.
• Press
[OBS]
to observe the
point to project.
• When recording the data as a
known point, press
{FUNC}
, and
then press
[REC]
on the second
page.
C
Recording method:
"22.1 Registering/Deleting
Known Point Data"
4. Press
[OK]
on the screen of step
3.
The following items are calculated
and displayed.
• Length: Distance along the
baseline from the first point to
the projected point (X direction).
16.2
Point Projection
Stn. Orientation
Define baseline
Point Projection
Point projection
P o i n t p r o j e c t i o n
N p :
E p :
Z p :
READ
OBS
EDIT
OK
1 2 . 1 5 2
1 0 3 . 5 1 4
1 0 1 . 4 2 3
P 1
a
P o i n t p r o j e c t i o n
L e n g t h
O f f s e t
d . E l e v
X Y Z
R E C
S - O
0 . 3 2 1 m
1 0 . 8 7 9 m
9 . 3 4 0 m
30R.book 75
ページ
2003年12月16日 火曜日 午後5時15分
Summary of Contents for 30R Series
Page 8: ...vi 30R book vi ページ 2003年12月16日 火曜日 午後5時15分 ...
Page 172: ...29 REGULATIONS 164 CE Conformity Declaration 30R_29 FM 164 ページ 2003年12月18日 木曜日 午後5時11分 ...
Page 173: ...165 29 REGULATIONS 30R_29 FM 165 ページ 2003年12月18日 木曜日 午後5時11分 ...
Page 177: ...30R book 1 ページ 2003年12月16日 火曜日 午後5時15分 ...
Page 178: ...8th ed 13 0408 Printed in Japan 2002 SOKKIA CO LTD 30R_C3C4 FM 2 ページ 2004年8月23日 月曜日 午後5時43分 ...