
61
14. SETTING-OUT MEASUREMENT
6. Press
[EDIT]
and set the following
items.
(1) Sdist/Hdist/Vdist: distance
from the instrument station to
the position to be set out.
(2) H ang: included angle
between the direction of the
reference and the point to be
set out.
• Pressing
[COORD]
in the
second page allows you to enter
the coordinates of the point to be
set out.
7. Press
[OK]
to set the input values.
8. Rotate the top of the instrument
until “dHA” is 0° and place the
target on the sight line.
9. Press
[OBS]
to start distance
measurement. The target and the
distance of the point to be set out
is displayed (S-O H).
10. Move the prism forward and
backward until the setting-out
distance is 0m. If [S-O H] is “+”,
move the prism toward yourself, if
it is “-”, move the prism away from
yourself.
H
H
H
READ S-O
EDIT
OK
l
4 0 0 0 0 0
H
H
H
a
OBS
S-O
l
REC
a
30R.book 61
ページ
2003年12月16日 火曜日 午後5時15分
Summary of Contents for 30R Series
Page 8: ...vi 30R book vi ページ 2003年12月16日 火曜日 午後5時15分 ...
Page 172: ...29 REGULATIONS 164 CE Conformity Declaration 30R_29 FM 164 ページ 2003年12月18日 木曜日 午後5時11分 ...
Page 173: ...165 29 REGULATIONS 30R_29 FM 165 ページ 2003年12月18日 木曜日 午後5時11分 ...
Page 177: ...30R book 1 ページ 2003年12月16日 火曜日 午後5時15分 ...
Page 178: ...8th ed 13 0408 Printed in Japan 2002 SOKKIA CO LTD 30R_C3C4 FM 2 ページ 2004年8月23日 月曜日 午後5時43分 ...