11
Materials Included In Series
100 Heavy Duty Standoff Kit:
Other Materials Required:
(1) SnapNrack HD Standoff Base
(1) SnapNrack HD Standoff Shaft
(1) SnapNrack Rubber Rain Collar
(1) SnapNrack Standoff Clamp
(1) 5/16in SS Split Lock Washer
(1) 5/16" - 18 X 2" SS HCS Bolt
(1) SnapNrack Bonding Channel Nut,
5/16" - 18
(2) 5/16" Lag Screw
(1) Roof Cone Flashing
Series 100 UL
Standoff Options
Design Tools
- SnapNrack has a suite of design tools
to help configure your PV installation to
be an accurate and fast install. Please
visit us at: www.SnapNrack.com.
Warning
- If a pilot hole is drilled and a rafter is not
found, immediately seal pilot hole with
roofing sealant to avoid water damage.
- Do not over tighten hardware.
- Always wear fall protection
and safety gear.
Notes
- SnapNrack engineered systems should
only be used with SnapNrack components
and hardware. Any alternate application
may void the warranty and structural
calculations could become invalid.
- Installing Contractor is responsible for
verification that attachments to roof
framing are fully engaged into appropriate
structural member and that structural
member is adequate for support of roof
mounting component and associated loads
Step-by-Step Instructions For
Zee Purlin Installation
1) Follow the instruction exactly
as the SnapNrack Standoff
penetration. Substituting the tek
Screw for the 5/16” lag bolt.
Step-by-Step Instructions For
Four Hole Installation
1) Follow the instruction exactly as the
SnapNrack regular Standoff penetration.
Substituting the base for the four hole base
and 1/4" wood screws for the 5/16” lag bolt.
Step-by-Step Instructions For
Heavy Duty Installation
1) Remove the foam roofing above
the rafter to be installed on.
2) Attach the SnapNrack heavy duty
standoff base directly to the exposed
rafter using (2) 5/16” lag bolts.
3) Screw in the SnapNrack HD Standoff
to the base snug with channel locks.
4) Replace the foam roofing
that was removed.
5) Flash the standoff by sliding the cone
flashing over the exposed standoff and
heat weld the rubber membrane around
the flashing for a water tight seat.
6) Attach remaining hardware as in
the standard SnapNrack standoff.
When To Use:
Foam Roofs
HD Base