SnapNrack Rail Cover
SnapNrack Wire Clip
SnapNrack Wire Clamp
1) TBD
3) TBD
2) TBD
4) TBD
37
1) Measure length of
cover needed
3) Secure all conductors in
rail channel
2) Cut cover to length
4) Snap on cover
Series 100 UL
Wire Management
Design Tools
- SnapNrack has a suite of design tools
to help configure your PV installation to
be an accurate and fast install. Please
visit us at: www.SnapNrack.com.
Warning
- Do not over tighten hardware.
- Always wear fall protection
and safety gear.
Notes
- SnapNrack engineered systems should
only be used with SnapNrack components
and hardware. Any alternate application
may void the warranty and structural
calculations could become invalid.
Step-by-Step Instructions
SnapNrack Rail Cover
1) Measure the length of the SnapNrack
rail cover that is needed. SnapNrack
standard lengths of rail covers are 48".
2) Cut the rail cover to length.
3) Place all electrical conductors in the
bottom of the rail to clear the rail cover.
4) Snap rail cover into place, enclosing
all conductors inside of rail channel.
SnapNrack Rail Cover is designed to
stay in place once installed. If it needs
to be relocated or removed use a flat
blade screw driver to remove.
SnapNrack Wire Clip
1) Place all electrical conductors in
the bottom of the rail channel.
2) Install the wire clip by snapping it into
place on the rail. All electrical conductors
are now securely enclosed in the rail.
1) Place all conductors
2) Snap on clip
When To Use
- For any exposed conductors to sunlight
that are not approved in UV light.
Summary of Contents for Series 100 UL
Page 48: ...48 Notes...