39
1) Snap in the channel
nut
2) Place the bolt and
washers
3) Tighten hardware
Series 100 UL
Micro Inverter Attachment
Design Tools
- SnapNrack has a suite of design tools
to help configure your PV installation to
be an accurate and fast install. Please
visit us at: www.SnapNrack.com.
Warning
- Do not over tighten hardware.
- Always wear fall protection
and safety gear.
Notes
- SnapNrack engineered systems should
only be used with SnapNrack components
and hardware. Any alternate application
may void the warranty and structural
calculations could become invalid.
Step-by-Step Instructions
1) Snap the SnapNrack micro inverter
attachment kit channel nut into the
desired location on the rail where the
micro inverter will be installed.
2) Attach the micro inverter to the
bolt on the micro inverter attachment
kit. Bolt and washers may need to
be removed and then replaced.
3) Tighten hardware, torque silver
hardware to 10-16 ft-lbs.
Summary of Contents for Series 100 UL
Page 48: ...48 Notes...