22
1) Locate the rafter
5) Tighten hardware
4) Attach corrugated
block with L-Foot
2) Drill the pilot hole
3) Apply roofing sealant
Series 100 UL
Corrugated Block
Design Tools
- SnapNrack has a suite of design tools
to help configure your PV installation to
be an accurate and fast install. Please
visit us at: www.SnapNrack.com.
Warning
- If a pilot hole is drilled and a rafter is not
found, immediately seal pilot hole with
roofing sealant to avoid water damage.
- Do not over tighten hardware.
- Always wear fall protection
and safety gear.
Notes
- SnapNrack engineered systems should
only be used with SnapNrack components
and hardware. Any alternate application
may void the warranty and structural
calculations could become invalid.
Step-by-Step Instructions
1) Locate the rafter underneath
the decking of the roof by locating
the screws. The rafter lies directly
underneath the screws.
2) Drill a pilot hole through the roofing
material into the rafter to ensure that
the lag bolt will be located into a solid
portion of the rafter. If the rafter is
not found then seal the pilot hole
immediately with roofing sealant.
3) Apply roofing sealant if needed
directly onto the pilot hole and
lag to ensure a water tight seal.
4) Attach the Corrugated Block with
L-foot using a 5/16” lag bolt (TYP)
or appropriate lag with a minimum
embedment of 2 ½” lag shank into
the rafter. Tighten lag bolt to seat.
5) Tighten L-foot assembly silver
hardware to 10–16 ft-lbs and tighten
black hardware to 8-10 ft-lbs.
Summary of Contents for Series 100 UL
Page 48: ...48 Notes...