36
9. Data Setting
9-1 Data Presetting
9-1-1 Data Classification & Content
P1
―
Cylinder Stroke Input stroke.
P2
―
Tolerance Input positioning tolerance range. Retries will assure the positioning
within the tolerance range.
P3
―
Retries Input no. of retries. Maximum retries will be 9. Since Err9 (positioning
error) will appear and the system will stop when positioning is not
able to be set within the range, it is advisable to set the max. retries
no.
P4
―
Bore Size Input cylinder bore size.
P5
―
Load Rate
Input the load rate (the amount of correction for load against the
movement of cylinder rod). Use formula as shown below: -
<Eg.> Bore size: 40(
⇒
0.04m)
Load: 200N (Allowable kinetic Energy)
Operating Pressure: 0.5MPa(
⇒
5×10
5
Pa)
200 ÷
0.04×0.04×3.14×5×10
5
×
100
=
31.8
=
30
%
4
P6
―
No. of Brake operation
P7
―
Origin Detection Time Set the Origin Detection time (t1).
(10ms as 1 unit, maximum will be 9.99s)
After inputting the homing (returning to origin)
‘s signal, if sensor does
not receive any signal within t1 (situation whereby the cylinder stops),
this reflects homing is achieved.
Setting of response time should take into consideration of load,
mounting condition, tubing length, etc. The response time should be
re
-
calibrated. If the operating conditions change.
When controller dip switch No.1, is set at ON, homing will be
confirmed in addition that the auto switch is ON.
P8
―
Err12 (Operating Error) confirmation time, t2.
*
Input Err12
’s decision time.
*
10msec as 1 unit. Max. will be 9.99sec.
*
Within the time frame, if there is no signal feedback by sensor
(cylinder stops) after inputting of start
’s signal. Err12 will be reported.
*
Setting of the detection time should take into the consideration of
load, mounting condition, tubing length, etc. If the operating
conditions change, re-calibrate the detection time.
9-1-2 Input Method
Turn the controller switching mode to RESET.
P1 will blink.
Load(N)
÷
Bore size(m) × D
2
×
π × Operating Pressure(Pa)
4
Round-off
PRG
STEP P1
″
″
″
〟
1000.0
Blinking
Summary of Contents for CE2
Page 14: ...2 2 System Configuration...
Page 20: ...5 External Dimension Drawing 5 1 Monosashi kun with Brake...
Page 21: ......
Page 22: ...5 2 Controller...
Page 23: ...5 3 Extension Cable...
Page 27: ...7 3 Input Signal Wiring 7 3 1 Input Signal Wiring Diagram...