12
©SMARTfit Inc. All Rights Reserved.
Pod Layout
Set up your pods in one of the following
layouts (floor, rack, wall):
1.
Pods can be laid out in any
configuration on the floor. No more
than 100’ from the CPU.
2.
Pods can be fastened to a rack in a
gym using any of the vertical rack
columns.
3.
Or on a wall using the provided
template with markings for the
Controller (optional) and the pods
to place provided wall screws in
various configurations:
a.
In a vertical line