Sunny Island
Installation & Operating Instructions
BWRI33-12:EE
- 93 -
SMA Regelsysteme GmbH
riod of time.
“PARREL“ (3+7)
Name Description
701_Man K1
Operating mode of relay K1
OFF:
Switching relay K1 off
ON:
Switching relay K1 on
AUTO:
Sunny Island automatically controls relay K1.
702_Man K2
as parameter 701, but for K2
703_Man K3
as parameter 701, but for K3
704_Man K4
as parameter 701, but for K4
705_Man K5
Operating mode of relay K5
OFF:
Switching relay K5 off
ON:
Switching relay K5 on
AUTO:
Sunny Island automatically controls relay K5.
RUN:
Relay is only switched on when Sunny Island is running.
RUN_U:
Relay is only switched on when Sunny Island is in grid-forming
operation.
RUN_I:
Relay is only switched on when Sunny Island is in grid-tied
operation.
HD_CTRL:
Relay is switched during transfer from grid-forming to grid-tied
operation.
TK_CTRL:
Relay is switched during transfer from grid-tied to grid-forming
operation.
HDTK_CTRL:
Relay is switched during any transfer from grid-tied to grid-
forming operation or vice versa.
GEN_MANU:
Relay is switched if generator has already been started before
the Sunny Island.
LOAD:
Relay is switched in relation to load (see parameter 625 to 630)
706_Man K6
as parameter 705, but for K6
707_Man K7
Operating mode of relay K7
OFF:
Switching relay K7 off
ON:
Switching relay K7 on
AUTO:
Sunny Island automatically controls relay K7.
708_Man K8
as parameter 707, but for K8
710_K1 t2 begin
0 ... 23 h:
Begin of special time period t2 for K1
711_K1 t2 end
0 ... 23 h:
End of special time period t2 for K1