GD_202011_RT Series_3-Phase Hybrid Inverter Commissioning Guide_V1.0
Page 1 of 11
© Sungrow Australia Group Pty. Ltd. All rights reserved.
As we continuously improving our services, changes to this document may occur without notice.
3-Phase Hybrid Inverter Commissioning Guide
Disclaimer
The material in this document has been prepared by Sungrow Australia Group Pty. Ltd. ABN 76 168
258 679 and is intended as a guideline to assist solar installers for troubleshooting. It is not a statement
or advice on any of the Electrical or Solar Industry standards or guidelines. Please observe all OH&S
regulations when working on Sungrow equipment.
Version
Revision History
Created by
Date
1.0
Issued for Approval
AU Service Team 23
th
Nov 2020
This document only applies to Sungrow 3-phase hybrid inverters (including SH5.0RT
and SH10RT). The information in this document may contain predictive statements
including, without limitation, statements regarding the future financial and operating
results, future product portfolio, new technology, etc. There are several factors that
could cause actual results and developments to differ materially from those expressed
or implied in the predictive statements. Therefore, such information is provided for
reference purpose only and constitutes neither an offer nor an acceptance. Sungrow
Power may change the information at any time without notice.