Sunny Island
Installation & Operating Instructions
BWRI33-12:EE
- 87 -
SMA Regelsysteme GmbH
“PARGEN“ (3+6)
Name
Description
627_PldS GenOn
- 100 … 100 % Switch-on threshold in % of the nominal power based on the
cumulative power within the three-phase sys tem for the
power-related generator start or the power-related relays
(only K5 or K6).
If the relays shall be switched in relation to the power, the parameters
“705_Man K5” and/or “706_Man K6” must be set to “LOAD“
628_PldS GenOff
- 100 … 100 % Switch-off threshold in % of the nominal power based on the
cumulative power within the three-phase sys tem for the
power-related generator start or the power-related relays
(only K5 or K6).
If the relays shall be switched in relation to the power, the parameters
“705_Man K5” and/or “706_Man K6” must be set to “LOAD“
629_TavgLdLx 5
… 60 s
Averaging time for the power calculation per phase (see also
“625_PldL GenOn” and “626_PldL GenOff”)
630_TavgLdSum 1
… 20 min
Averaging time for the calculation of the cumulative power
within the three-phase system (see also “627_PldS GenOn”
and “628_PldS GenOff”)
631_PldLzMin 0
… 100 %
Lower limit for the charging state, when the Ecopower CHP
will always be started
632_PldLzMax 0
… 100 %
Upper limit for the charging state, when the Ecopower CHP
will never be started
633_PConsMin 0
… 2000 W
Power limit for the load power (cumulative power averaged
over all three phases within the time period of the parameter
“630_TavgLdSum“), that has to be exceeded, in order to
start the Ecopower CHP even in the case of charging states
between “631_PldLzMin” and “632_PldLzMax“.
634_PConsMax 0
… 10.000 W
Upper limit for the load power (cumulative power averaged
over all three phases within the time period of the parame-
ter), when the Ecopower CHP will already be started in the
case of a charging state of
“632_PldLzMax”.
635_PChargeMax 0
… 16.000 W
Setpoint for the charging power, that the Sunny Island ob-
tains from the Ecopower CHP.
636_PDump1 0
… 8.000 W
Power of Dumpload 1, that has to be connected to the relay
K1 of the Sunny Island during the operation with the eco-
power CHP. (“701_Man K1“ = Auto)
637_PDump2
0 … 8.000 W
Power of Dumpload 2, that has to be connected to the relay
K6 of the Sunny Island during the operation with the Eco-
power CHP. (“706_Man K6“ = Auto)
638_PBHKWMin 0
… 4.000 W
Minimum power of the Ecopower CHP
639_PBHKWMax 0
… 10.000 W
Maximum power of the Ecopower CHP
640_BHKW_Ton
0 … 10.000 s
Minimum run-time of the Ecopower CHP
641_BHKW_Toff 0
… 10.000 s
Minimum pause time of the Ecopower CHP