Sunny Island
Installation & Operating Instructions
BWRI33-12:EE
- 15 -
SMA Regelsysteme GmbH
3 Installation
The Sunny Island may only be installed by a qualified technician.
Please read the corresponding chapters carefully. All installation
work must be executed in compliance with the relevant standards.
Please follow the general safety instructions (chapter 1.3).
3.1 Mounting Accessories Included in Delivery
Please find below the components ensuring easy mounting and installation of the
Sunny Island which are included in delivery:
1 Installation and Operating Instructions
1 Slide for recommended mounting to wall (Fig. 3.2)
4 PG 13.5 glands incl. nuts
4 PG 13.5 blank screwed joints
3 PG 16 glands incl. nuts
3 Alkali manganese battery cells
1 Plug for battery temperature sensor
1 Plug “Diesel I U“
The following components can be delivered as an option:
•
Pt100 contact sensor to determine the battery temperature (SMA order name
“SI-BTS“). It is indispensable to connect a temperature sensor.