![SKY Agriculture Methys FT Original Instructions Manual Download Page 155](http://html1.mh-extra.com/html/sky-agriculture/methys-ft/methys-ft_original-instructions-manual_1289679155.webp)
J
S
EED
CONTROLLER
The seed controller’s main ECU, which is placed under the distribution head, is equipped with two status LEDs.
Red LED
LED status
Information
Check
Quick fl ashing
No communication with the fl ow sensors.
Check the connections.
OFF
Normal operation
always on
No CAN communication.
Check the connections.
Green LED
LED status
Information
Check
Slow fl ashing
Normal operation
OFF
No power supply voltage
Check that the machine is under voltage.
always on
Software updating
Check that the update was successful.
Red LED
LED status
Information
Check
OFF
Normal operation
always on
Sensor dirty or obstructed.
Check if the sensor is obstructed
or dirty and clean it.
Quick fl ashing
No communication with the ECU
Check the connections.
Slow fl ashing
Sensor in confi guration or acquisition mode.
Green LED
LED status
Information
Check
Slow fl ashing
Normal operation, without product passage.
Quick fl ashing
Normal operation, with product passage detection.
OFF (with red LED OFF)
No power supply voltage
Check the connections.
OFF (with red LED ON)
Sensor dirty.
Clean the blocking sensor No. X
always on
Software updating
The operation of the seed controller is only guaranteed with wheat.
155
EN
7
Equipements / Accessories / Ausrüstungen
Summary of Contents for Methys FT
Page 2: ......
Page 14: ...A 14 Livraison Delivery Lieferung ...
Page 16: ...A 16 Livraison Delivery Lieferung ...
Page 18: ...B 18 Livraison Delivery Lieferung ...
Page 20: ...1 1 1 C 20 Livraison Delivery Lieferung ...
Page 26: ...B 26 Mise en route Start up Inbetriebsetzung ...
Page 28: ...1 SE 1 SE 1 DE 1 DE 1 DE 1 SE 1 DE 1 DE On Of C 28 Mise en route Start up Inbetriebsetzung ...
Page 32: ...3 3 2 2 1 1 D 32 Mise en route Start up Inbetriebsetzung ...
Page 34: ...1 2 D 34 Mise en route Start up Inbetriebsetzung ...
Page 36: ...E 36 Mise en route Start up Inbetriebsetzung ...
Page 38: ...E 38 Mise en route Start up Inbetriebsetzung ...
Page 40: ...E 40 Mise en route Start up Inbetriebsetzung ...
Page 42: ...1 2 H H d 15m d 30m maxi F 42 Mise en route Start up Inbetriebsetzung ...
Page 44: ...1 5 G 44 Mise en route Start up Inbetriebsetzung ...
Page 46: ...I 46 Mise en route Start up Inbetriebsetzung ...
Page 48: ...1 J 48 Mise en route Start up Inbetriebsetzung ...
Page 122: ...1 1 5 5 3 3 4 4 2 2 1 1 7 7 a a 8 8 A 122 Entretien Maintenance Wartung ...
Page 126: ...1 1 2 2 5 5 2 2 4 4 B 126 Entretien Maintenance Wartung ...
Page 128: ...C 128 Entretien Maintenance Wartung ...
Page 130: ...E 130 Entretien Maintenance Wartung ...
Page 132: ...3 3 2 2 1 1 2 2 2 2 2 2 F 132 Entretien Maintenance Wartung ...
Page 134: ...1 2 2 F 134 Entretien Maintenance Wartung ...
Page 136: ...G 136 Entretien Maintenance Wartung ...
Page 138: ...1 1 H 138 Entretien Maintenance Wartung ...
Page 140: ...1 2 3 2 3 4 5 6 5 1 3 4 A 140 Equipements Accessories Ausrüstungen ...
Page 142: ...1 2 2 3 A 142 Equipements Accessories Ausrüstungen ...
Page 144: ...3 3 4 4 1 1 2 2 B 144 Equipements Accessories Ausrüstungen ...
Page 146: ...2 2 3 3 1 1 4 4 4 4 5 5 C 146 Equipements Accessories Ausrüstungen ...
Page 148: ...2 2 1 1 3 3 4 4 E 148 Equipements Accessories Ausrüstungen ...
Page 150: ... 126 697 105 622 105 620 105 621 4mm H 150 Equipements Accessories Ausrüstungen ...
Page 152: ...1 1 2 2 3 3 4 4 J 152 Equipements Accessories Ausrüstungen ...
Page 154: ...1 1 2 2 3 3 4 4 J 154 Equipements Accessories Ausrüstungen ...
Page 156: ...1 1 2 2 3 3 4 4 J 156 Equipements Accessories Ausrüstungen ...
Page 158: ...1 2 2 2 2 2 2 3 3 3 3 K 158 Equipements Accessories Ausrüstungen ...
Page 168: ...3 3 1 1 2 2 A 168 Diagnostic Diagnostic Diagnose ...
Page 170: ...3 3 1 1 2 2 A 170 Diagnostic Diagnostic Diagnose ...
Page 172: ...3 3 1 1 2 2 A 172 Diagnostic Diagnostic Diagnose ...