13
Emergency shutdown
This is done by a course of action to be defined by the operator.
Assembly, maintenance, fault, repair
Prior to the start of this work, all relevant persons must be notified of it. At a minimum, the following safety measures must be
taken before any work is done:
"
Unauthorised persons must be kept away
"
Mark and secure the work area
"
Cover adjacent live parts
"
Dry any wet, slippery surfaces or cover them appropriately
"
Cover hot or cold surfaces appropriately
Where applicable:
"
Depressurise
"
Isolate, lock and tag out
"
Check to ensure live voltage is no longer present
"
Ground and short-circuit
The product should be protected as much as possible from humidity, dust, and vibration, and should be installed so that it is
easily accessible. Ensure an adequate distance from sources of heat and cold surfaces. Any visual monitoring devices present,
such as pressure gauges, min./max. markings, or oil level gauges must be clearly visible. Observe the mounting position
requirements.
Drill required holes only on non-critical, non-load-bearing parts of the operator's infrastructure. Use existing holes where
possible. Avoid chafe points. Immobilise any moving or detached parts during the work. Adhere to the specified torques.
If guards or safety devices need to be removed, they must be reinstalled immediately following conclusion of work and then
checked for proper function.
Check new parts for compliance with the intended use before using them.
Avoid mixing up or incorrectly assembling disassembled parts. Label parts. Clean any dirty parts
Summary of Contents for ST-1240-GRAPH
Page 17: ...17...
Page 25: ...25 Dimensions...